News

News

News

11.11.2021

In 2022, we made significant investments in new production equipment for the future

News at SILIKATY Barlinek


In 2022, we made significant investments in new production equipment for the future, including the purchase of a second used hydraulic press and four state-of-the-art 6-axis robots, as well as a powerful photovoltaic system installed in the summer. These measures represent the first important milestone in the modernization of our plant and the optimization of our production capacities.


In 2023, the raw material mixing system was comprehensively modernized, with a focus on introducing a new sand feed system with integrated moisture measurement and additive dosing equipment. Additionally, a new electrical control system was implemented, significantly improving the efficiency and precision of the mixing processes.


In the summer of 2024, we began implementing the automatic packaging system, and the modernization of our steam generation plant was successfully completed. A modern system for cleaning hardening trolleys, equipped with an automatic hardening trolley storage system, complements the modernization measures as an integral part of our in-house transport system.


These continuous improvements are part of our long-term strategy to double production capacity by 2026 and strengthen our market position.

Silikaty Barlinek

The sand-lime brick factory SILIKATY Barlinek was built in 2008 and has since established itself as a significant manufacturer of sand-lime bricks in ...

Read more

QUALITY POLICY

Our company places great importance on the quality of our products and undergoes regular inspections and certifications by the international, independ...

Read more

Production Process

Walls

Advantages of Silicates